We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Our technicians are trained to tell a cosmetic hairline crack apart from one that signals structural movement, before recommending a fix.
Most crack injection appointments can be scheduled within a day or two of your call.
Pricing is based on crack length and injection material, quoted in writing before we drill any injection ports.
We carry both structural epoxy and flexible polyurethane so the crew can match material to the crack on the same visit.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Epoxy-injected cracks regain much of their original structural strength, which matters for load-bearing foundation walls.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
We also check for bowing alongside stair-step cracks, since that combination can point to a bigger structural issue.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Selling a Pleasant Ridge, MI home with a flagged foundation crack? We can inspect, repair, and provide documentation for the buyer's lender or inspector.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
We also check the exterior grading near the crack, since poor drainage is often what caused it in the first place.
We explain why we're recommending one material over the other so the choice isn't a black box.
We check the injection ports after curing to confirm the material fully filled the crack before we consider the job done.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Pleasant Ridge Seller
"They explained why our crack was structural and not just cosmetic, which the previous contractor never bothered to check."
— Pleasant Ridge Homeowner
"Appreciated the before-and-after photos for our records in case we ever need them for a future sale."
— Pleasant Ridge Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Pleasant Ridge Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Turnaround is usually fast enough to fit within a typical closing timeline.
Selling a Pleasant Ridge property on a tight timeline? Call +1-866-476-1348 and we'll prioritize scheduling around your closing date.



Zip codes we serve in Pleasant Ridge, MI: 48069
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.